Polyurethane foam roofing application over modified bitumen roof.
Spray applied polyurethane foam roofing.
Spray polyurethane foam roofing systems when it comes to the roof over your head discover why you can count on spray polyurethane foam spf.
If you choose spray applied foam roofing for your building s roof here are the steps involved in its installation.
Spfa 141 spray polyurethane foam for cathedralized ceilings and unvented conditioned attics this document provides design and installation guidance for spf insulation directly beneath sloped roof decks above cathedralized ceilings and unvented conditioned attics.
There is no need to strip the entire roof instead we will prepare it by first removing all dust dirt and other contaminants.
Spray polyurethane foam application spf roofs are installed by spraying a liquid on the existing roof and allowing it to expand into a foam.
Installation performed by washington roofing.
Total payback of your new roof usually occurs in less than ten years through savings in heating and cooling costs.
Astm d6947 standard specification for liquid applied moisture cured polyurethane coating used in spray polyurethane foam roofing system astm d7425 standard specification for spray polyurethane foam used for roofing applications warranties when purchasing a new roof system there will be two warranties to consider.
Spray polyurethane foam is a liquid sprayed on and eventually expands into a foam thus forming a solid layer on an existing roof.
Polyurethane foam roofing has the highest r value of any commonly used roof insulation.
Spfa 145 surface texture of spray polyurethane foam.
This process means that the foam can conform to all roof shapes and types even irregularly shaped roofs.
In general these warranties cover defects in the manufacture of the roof membrane.
Provide the highest wind uplift and severe hail resistance in the industry are sustainable through recoating skytite spray applied polyurethane foam roofing systems and skytite protective coatings have been tested and approved by third party accreditation to meet and exceed most performance requirements.
Before it is applied the existing roof or the substrate needs to be ready.